The sealing is used at exposed concrete construction between pressure cone and formwork shell. It helps to secure a perfect concrete surface.
The high-quality exposed concrete cones are bonded, with contact adhesive X1, in the remaining opening after removing the pressure cones. Apply the contact adhesive on the backside to obtain a clean visible area.
The high-quality, precisely tailored exposed concrete cone is glued in flush after the pressure cones have been removed in order to achieve a clean visible surface.
The pressure cones are attached to the spacer tube. After concreting, the pressure cones are removed from the concrete and can be reused.
Formwork spacer tube "made of one piece" with two sealing plugs. Secure the wall thickness reliably! Material: HDPE
Spacer tubes with a roughened surface from Ø 20mm to Ø 40 mm in bundles Ø 20mm to Ø 22mm 100 running meters per bundle Ø 26mm to Ø 32mm 50 running meters per bundle Ø 40mm 30 running meters per bundle
Fiber concrete - plugs for FC distance tubes. Usually glued inside the fiber concrete tube.
Viewed