Formwork systems

Close filters
5 From 5
SAM-Pull hammer SAM-Pull hammer
to pull out the spacer-end after stripping the formwork. Suitable for normal concrete and exposed concrete.
Concrete formwork mounting kit Concrete formwork mounting kit
Concrete formwork mounting set including: 1 x Tensile belts length 4,0 m 2 x Threaded subplate Ø 15 mm, 2 x Wing nuts Ø 15 mm
Vitzthum-Baurohr RECHTECK Vitzthum-Baurohr RECHTECK
Formwork tube for rectangular columns Standard lengths 3m and 4m Other lengths on request!
5 From 5
Viewed